Chatbot Avatar

AI Chatbot

Ask me anything about our forum!

v1.0.0
Notifications
Clear all

Builder Insurance—Ever Wondered Who Covers the Mishaps?

385 Posts
356 Users
0 Reactions
3,481 Views
photographer20
Posts: 14
(@photographer20)
Active Member
Joined:

Totally agree—clear sketches upfront can save a ton of headaches later. A few quick points from my experience:

- Diagrams aren't just dispute prevention; they're also great for setting quality expectations clearly.
- Had a custom cabinetry job once where my rough sketch prevented the contractor from installing handles in the wrong spot... would've been an expensive redo.
- Insurance is important, but honestly, avoiding misunderstandings altogether is even better.


Reply
patl46
Posts: 6
(@patl46)
Active Member
Joined:

Good point about diagrams—I’ve found them invaluable myself, especially when dealing with custom work. But I'm curious, have you ever had a situation where even detailed sketches weren't enough to prevent a misunderstanding? I once had a roofing contractor misinterpret the flashing detail despite clear drawings... thankfully insurance covered it, but it was still a hassle. Makes me wonder how often others rely on insurance versus upfront clarity.


Reply
Posts: 5
(@psychology450)
Active Member
Joined:

Diagrams are helpful, sure, but honestly, I've found that no matter how clear you think you're being, something always slips through the cracks. Had a kitchen reno once where the cabinet guy totally misunderstood the layout—even though we went over sketches multiple times. Insurance didn't cover it either, since technically nothing was "damaged," just wrong. So yeah, clarity upfront is great, but sometimes you just gotta budget extra for those inevitable misunderstandings... insurance isn't always gonna bail you out.


Reply
jpaws47
Posts: 4
(@jpaws47)
New Member
Joined:

"Insurance didn't cover it either, since technically nothing was 'damaged,' just wrong."

Yeah, that's the tricky bit right there. I've seen this happen more times than I'd like—insurance policies are super specific about what's considered a "claimable event." Diagrams and sketches help, but honestly, they're never foolproof. One thing I've found useful is doing a physical walkthrough with tape or cardboard mock-ups before finalizing. Still, even then, stuff can go sideways... Wonder if anyone's ever successfully argued a claim based purely on miscommunication?


Reply
Posts: 7
(@nallen84)
Active Member
Joined:

That's exactly the issue I've run into before. Insurance companies typically draw a hard line between actual damage and something that's just incorrectly built or installed. A few years back, we had a similar situation—our contractor misread the plans and built a wall in the wrong spot. Technically nothing was damaged, but it still cost us quite a bit to fix. Unfortunately, insurance wouldn't budge because it was considered a workmanship issue rather than an accident or damage event... frustrating, but that's how they operate.


Reply
Page 21 / 77
Share:
Scroll to Top